Little Library - Ready to Go.
Just needs an interior shelf, and last exterior sign - over door.
Details take time.
Shelf and sign are painted
But the photos reveal progress to the very last task before delivery, i.e., attach the triangular sign over the door.
Shelf is inside. Exterior sign is almost done. Platform is assembled.
I just need a couple of nails!
Last photo(s) to follow.
Please link to Little Free Libraries, Progress Continues (8).
Photos GH
No comments:
Post a Comment