Thursday, March 10, 2016

2016: The Workshop is Now Open

The First Batch of the Season

"I have a trunk-load of fresh lumber ready to go"

After two months away from building birdhouses and what-not, I unlocked the workshop door March 1st as planned. I put away Christmas lights and chairs and uncovered the table saw. I was soon at work on a batch of ten birdhouses, small- to medium-sized, using red cedar for the face and back, pine barnboard for roofs, and rescued lumber for the sides and bases.

I puttered along at first, and as I got back into the groove the process sped up. A few days after opening the door I saw ten birdhouses - like ducks - sitting in a row.


"Back in the saddle again"

Link to Big Sweep 6 (Dec. 31, 2015)

Photos GH

No comments:

Post a Comment